Chesterfield County |
Code of Ordinances |
Part II. THE CODE |
Chapter 18. WATER AND SEWERS |
Article IV. INDUSTRIAL WASTE DISCHARGE |
§ 18-105. Modification of permit.
(a)
The director may modify a permit to insure that the significant industrial user complies with changed conditions, or with changes in local, state or federal regulations. The director shall make modifications as soon as possible after the changed conditions or regulations occur. The director shall allow a significant industrial user a reasonable period of time to comply with any modifications to the permit, unless emergency conditions or governmental regulations require earlier compliance. The director may modify a permit if any of the following conditions occur:
(1)
If there is a change of Chesterfield County's system that requires either a temporary or permanent reduction or elimination of authorized discharge.
(2)
If there are violations of any terms or conditions of the permit.
(3)
If there is a misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit or in any required reporting.
(4)
To correct typographical or other errors in the permit.
(5)
To reflect a transfer of facility ownership or operation to a new owner or operator in accordance with section 18-107.
(b)
Significant industrial users shall notify the director in writing of any increases or changes in the volume of flow or the nature of the pollutants in the industrial waste discharge that is regulated by the permit. The director may approve the increase or change subject to conditions or he may disapprove the increase or change.
(Code 1978, § 20-100; Ord. of 4-29-09(1), § 1)
(Code 1978, § 20-100; Ord. of 4-29-09(1), § 1)