§ 8-25. Responsibility for the erosion and sediment control plan.  


Latest version.
  • The owner shall be responsible for preparing, submitting and implementing the erosion and sediment control plan. The owner shall also be responsible for the following:

    (a)

    Engaging the services of a responsible land disturber as defined in this chapter;

    (b)

    Maintaining all measures required by the erosion and sediment control plan;

    (c)

    Removing erosion and sediment control measures after the environmental engineer determines that the land is stabilized;

    (d)

    Removing all sediment from sediment basins that are to be converted to permanent best management practice facilities as required by the environmental engineer; and

    (e)

    All sediment basins constructed in conjunction with single family subdivisions or sections thereof that drain to the Swift Creek Reservoir must remain in place and fully stabilized until such time as compliance with subsection 19.1-541.4 has been achieved.

    (f)

    The restoration or repair of properties and/or waters that have been adversely affected by the transport of sediment from the project site which is deemed necessary by the environmental engineer.

    (Ord. of 4-9-14(3), § 1; Ord. of 8-26-15(1), § 1)