§ 15-67. Tests and performance monitoring.  


Latest version.
  • (a)

    Not later than 90 days after the grantee makes available any new or substantially rebuilt portions of the system for service to subscribers, the grantee shall perform technical performance tests to demonstrate full compliance with the technical standards of the Federal Communications Commission and this article. An engineer or other person with proper training and experience approved by the county shall perform or supervise such tests. The report shall describe test results, instrumentation, calibration and test procedures, and shall state the qualifications of the engineer responsible for the tests. A copy of the report shall be submitted to the county.

    (b)

    The grantee shall submit to the county a copy of the grantee's proof of performance tests which is required to be filed with the Federal Communications Commission ("FCC") at the same time that the report is submitted to the FCC.

    (Code 1978, § 7-27)

(Code 1978, § 7-27)