§ 18-57. Required installations of utility laterals and mains.  


Latest version.
  • The developer shall install all utility service laterals and utility mains in his development at his expense. The service laterals and mains shall be connected to the utility system and shall comply with all state and county utility specifications and procedures. The developer shall maintain all utility service laterals at his expense until the county installs the water meter for the lateral and the wastewater lateral is connected. The developer shall maintain records which show the location of all utility laterals, until the laterals are connected.

    (Code 1978, §§ 20-40, 20-64)

(Code 1978, §§ 20-40, 20-64)